Liger Interiors designs and renovates villas and townhouses across Dubai, from single-room makeovers to full-home transformations. We plan every room in 3D, choose finishes that suit Dubai’s climate, and oversee execution through our trusted contractors. Every project is personally supervised by our founder.
Villas bring bigger rooms, double-height spaces, separate family and guest areas, and outdoor living, so a villa can easily feel empty, echoey or disconnected if it is furnished one room at a time. Good villa interior design starts with the whole house: how family, guests and staff move through it, where the majlis or formal living sits, and how one consistent palette carries from the entrance to the bedrooms.
Dubai adds its own demands. Strong sun, humidity and dust affect which fabrics, woods and stones last. Our guide on villa vs apartment renovation in Dubai explains the key differences.
Choose design only, or design with fully managed execution. We work within the existing structure, so layouts, finishes and joinery change, but walls and slabs stay where they are.
Space planning, a palette for the whole house, and photorealistic 3D renders of every key room before any work begins.
New flooring, ceilings, kitchens, bathrooms, lighting and finishes, delivered by our trusted contractors under founder supervision.
Smart storage, stair and landing design, and open ground floors that make narrower townhouse plans feel generous.
Where we started: statement walls, panelling, textured plasters and stone that give villa spaces a focal point.
Walk-in wardrobes, kitchens, TV walls and built-in storage, designed by us and made by trusted joinery contractors.
Natural stone, bespoke furniture, statement lighting and curated art for high-end villas.
Townhouses are a large part of our work, especially in Villanova, where we have completed more than seven projects. Townhouse plans are usually narrower, with more vertical movement, so the details matter: under-stair storage, a landing that works as a study or reading nook, a ground floor opened up into one living, dining and kitchen space, and bedrooms that each get proper wardrobe space.
See our townhouse projects at La Rosa 5, Villanova, La Rosa 2, Villanova and Emaar South, or browse townhouse interior design ideas. We also cover duplex homes with the same approach.








See all our work on the featured projects page, or read before and after: 5 villa projects.
Six stages from first call to handover. Before you start, read how to prepare your villa for renovation, or see our full process.
Share your villa's floor plan so we understand the layout and the likely scope.
A call about your goals, style, how the family uses the house, timeline and budget.
A paid consultation at your villa to review each room and agree the brief.
Space planning, a whole-house palette and 3D renders of every key room.
A detailed, transparent quotation for the works once the design is final.
Our trusted contractors handle approvals for major works and carry out the build, supervised by our founder through to handover.
Cost depends on the size of the villa, how many rooms are included, the finishes and joinery you choose, and whether you want design only or design with execution. We start with the 3D design service, then give you a detailed execution quotation once the design is final, so you see every cost before work begins.
For typical ranges, read how much villa renovation costs in Dubai and our interior design cost guide.
| Villa project | Typical timeline |
|---|---|
| Single-room makeover or upgrade | About 4 – 6 weeks (excluding design) |
| Several rooms or one full floor | Confirmed after the site visit |
| Full villa renovation | 3 – 6 months |
| Design only (3D concept) | Confirmed at consultation |
You receive a detailed schedule during the initial consultation. Approvals and custom joinery can affect timelines.
Whoever you hire, check these points before you sign:
Our guide on choosing the right interior design company for your villa covers each point, and villa fit-out mistakes to avoid shows what goes wrong most often.
More questions? See the FAQ on our interior design company in Dubai homepage, or message us on WhatsApp.
It depends on the villa’s size, the number of rooms, finishes, joinery, and whether you choose design only or design with execution. We begin with the 3D design service and then provide a detailed execution quotation. See villa renovation costs in Dubai for typical ranges.
Single-room makeovers usually take about 4 to 6 weeks, excluding the design phase. A full villa renovation typically takes 3 to 6 months. We share a detailed schedule during the initial consultation.
No. We do not undertake structural changes. We redesign layouts, finishes, ceilings, joinery, lighting and furniture within the existing structure, and coordinate all interior works within the approved scope.
For major works, our appointed contractors handle the required approvals and documentation. For minor works, we prepare the drawings and documents for you to submit to your community management or the relevant authority. See how to get a renovation permit in Dubai.
It depends on the scope. Some phases create dust, noise and debris and are not suitable while the house is occupied. Minor works and upgrades to selected rooms can often be done while you live there.
Yes. You can choose our design-only service, which includes layouts and 3D visuals. See our interior design drawings service. For full execution, we manage the work through our trusted contractors.
Yes. Townhouses make up a large share of our work, including more than seven projects in Villanova. See our La Rosa 5 townhouse project.
No. Our on-site consultations are paid sessions, so we can give your villa focused, professional time. Contact us to learn about our consultation process and fees.