Liger Interiors is a renovation company in Dubai that plans, designs and carries out full-home and single-room renovations. Kitchens, bathrooms, floors, ceilings, wardrobes and full layouts are handled by one team, from the first site visit to the final walkthrough.
Many Dubai homes were built with standard layouts, finishes and lighting that no longer suit the people living in them. A renovation fixes what does not work: a cramped kitchen, a leaking bathroom, dark rooms, worn floors, or storage that never fits. It is also the moment to plan for Dubai’s heat, with better insulation, LED lighting and finishes that handle humidity. See how to design a home that stays cool in Dubai.
For owners who plan to sell or rent, updated kitchens, bathrooms and flooring are what buyers and tenants notice first. Our guide to renovation choices that add property value covers where the money is best spent.
Renovate one room or the whole property. Villas and apartments need different planning. Villas usually involve more structural and outdoor work, while apartments depend on building rules and working hours. Read villa vs apartment renovation in Dubai for the details.
Full-home renovations: new layouts, kitchens, bathrooms, ceilings, flooring and finishes throughout, planned room by room.
Studios to penthouses, planned around your building's NOC rules and permitted working hours.
Custom cabinets, quartz, granite or marble countertops, backsplashes, better storage, and updated plumbing, electrics and ventilation.
Waterproofing, floor and wall tiles, vanity units, glass showers, lighting and extraction fans to keep moisture out.
Marble, porcelain, SPC or wood flooring; paint and textured wall finishes; gypsum false ceilings with new lighting.
Refits for offices, shops, clinics and restaurants, handled by our fit-out team.





You get a written scope and quote before any work starts. Renovating a villa? Read how to prepare your villa for renovation first.
We hear your ideas, then measure the space, take photos and check walls, floors, ceilings and utilities for hidden problems.
Layout plans, mood boards and 3D visuals. We revise until you approve.
An itemised quote listing work and materials. You see and choose samples before anything is ordered.
Building NOC and renovation permits, then the works, supervised by a site manager, with regular updates.
A detailed snag check, fixes, a full clean and a walkthrough with care instructions.
Timelines depend on size, approvals and custom joinery. The table shows typical ranges; you get an exact schedule in writing before work starts. Cost depends on space size, materials and scope, so we quote after the site visit. For price ranges, see our cost guides for villa renovation, apartment renovation and kitchen renovation.
| Project | Typical timeline | Cost guide |
|---|---|---|
| Single room (e.g. kitchen or bathroom) | 2 – 3 weeks | Kitchen costs |
| Full apartment | 4 – 8 weeks | Apartment costs |
| Villa or townhouse | 8 – 12 weeks | Villa costs |
| Office or shop | After site visit | Fit-out costs |
Timelines start after design approval and permits. Custom joinery and large layout changes can add time.
Quotes from different renovation companies can look similar but cover very different work. Before you sign, check these points in writing.
Avoid the usual problems with our guides to interior renovation mistakes and home renovation mistakes in Dubai. Not sure whether you need a designer or a contractor? Read interior designer vs contractor. You can also see our list of renovation firms in Dubai.
Have another question? Message us on WhatsApp or read what is included in interior design services.
It depends on the size of the project. A single room such as a kitchen usually takes 2 to 3 weeks, a full apartment 4 to 8 weeks, and a villa 8 to 12 weeks. These times start after design approval and permits. We give you the exact timeline in writing before work begins.
Yes. We prepare and submit the paperwork for your building management NOC and the relevant authority, such as Dubai Municipality, and follow up until it is approved. Our guide to getting a renovation permit in Dubai explains the steps.
Cost depends on the size of the space, the materials and how much work is involved. We give you an itemised quote after the site visit. For typical ranges, see our villa renovation cost and apartment renovation cost guides.
Usually, yes. We can work room by room so you always have usable space, keep work areas separated, and clean up every day. For kitchens and bathrooms, plan for a short period without them.
Yes. Many clients start with the kitchen or bathroom. See our bathroom renovation ideas and kitchen renovation trends for inspiration.
Renovation updates an existing space, while a fit-out usually finishes an empty or shell unit, often for a business. We do both. For offices, shops and clinics, see our interior fit-out services.
All of Dubai, including Jumeirah, Dubai Marina, Business Bay, Al Barsha, JVC, Al Furjan, MBR City, Downtown Dubai, Palm Jumeirah, Arabian Ranches, The Springs and The Meadows.